100 ton large electric heating boiler systems Agents
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Apr 05, 2011 · The boiler block is the main unit where coal is burned with air to generate high pressure steam; the generator block contains the steam turbine/electric generator set, condenser and cooling water; and the third block is the flue gas clean-up unit which removes particulate matter (PM) and other pollutants from the flue gas to control emissions.Get Price
District heating (also known as heat networks or teleheating) is a system for distributing heat generated in a centralized location through a system of insulated pipes for residential and commercial heating requirements such as space heating and water heating.The heat is often obtained from a cogeneration plant burning fossil fuels or biomass, but heat-only boiler …Get Price
District heating (also known as heat networks or teleheating) is a system for distributing heat generated in a centralized location through a system of insulated pipes for residential and commercial heating requirements such as space heating and water heating.The heat is often obtained from a cogeneration plant burning fossil fuels or biomass, but heat-only boiler …Get Price
The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price
Nov 24, 2016 · BOILER INTERVIEW QUESTION & ANSWER Today we discussed about some multiple choice questions and answer related to power plant these questions are very helpful for which do preparation for B.O.E ( BOILER OPERATION ENGINEER ) EXAM. and also for ENERGY MANGER EXAM, and also for those people which prepared …Get Price
Nov 24, 2016 · BOILER INTERVIEW QUESTION & ANSWER Today we discussed about some multiple choice questions and answer related to power plant these questions are very helpful for which do preparation for B.O.E ( BOILER OPERATION ENGINEER ) EXAM. and also for ENERGY MANGER EXAM, and also for those people which prepared …Get Price
The off-gas at a rate of 66,000 Nm3/h leaves the afterburner chamber at a temperature of 1000°C. Heat is recovered in a steam boiler. The gases leave the boiler at 270°C. Steam is generated at 25 atm and superheated to 250°C at a rate of 34 t/h. A steam turbine generates electric power at the rate of 1320 kw/h consuming 22 t/h steam.Get Price
The heating elements in an electric boiler are also subject to deterioration as a result of mineral deposits. This can be avoided by selection of appropriately enclosed or sheathed heating elements. Electric boilers are available for steam or hot water. Heat Pumps. The heat source for a building can consist of one or more heat pumps.Get Price
The heating elements in an electric boiler are also subject to deterioration as a result of mineral deposits. This can be avoided by selection of appropriately enclosed or sheathed heating elements. Electric boilers are available for steam or hot water. Heat Pumps. The heat source for a building can consist of one or more heat pumps.Get Price