high pressure boiler Agent observation door

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :high pressure boiler Agent observation door
  • Supply Capacity : 10 units/month :high pressure boiler Agent observation door
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Boiler - Wikipedia

    Heat sources. In a fossil fuel power plant using a steam cycle for power generation, the primary heat source will be combustion of coal, oil, or natural gas.In some cases byproduct fuel such as the carbon monoxide rich offgasses of a coke battery can be burned to heat a boiler; biofuels such as bagasse, where economically available, can also be used.. In a nuclear power plant, …Get Price

  • Rankine cycle - Wikipedia

    The actual vapor power cycle differs from the ideal Rankine cycle because of irreversibilities in the inherent components caused by fluid friction and heat loss to the surroundings; fluid friction causes pressure drops in the boiler, the condenser, and the piping between the components, and as a result the steam leaves the boiler at a lower Get Price

  • NFPA 33 Spray Booth Regulations and Guidelines - Spray Systems

    Sep 11, 2018 · 8.5.5.1 Containers that meet the following requirements need not meet the requirements of the ASME Boiler and Pressure VesselCode, Section VIII, for construction, tests, and maintenance: (1) Pressure containers less than 150 mm (6 in.) in diameter (2) Pressure containers that operate at less than a gauge pressure of 1.03 kPa (15 psi)Get Price

  • NFPA 33 Spray Booth Regulations and Guidelines - Spray Systems

    Sep 11, 2018 · 8.5.5.1 Containers that meet the following requirements need not meet the requirements of the ASME Boiler and Pressure VesselCode, Section VIII, for construction, tests, and maintenance: (1) Pressure containers less than 150 mm (6 in.) in diameter (2) Pressure containers that operate at less than a gauge pressure of 1.03 kPa (15 psi)Get Price

  • Commissioning - M&E Prefunctional Checklists

    Safety controls installed and safe operating ranges for this equipment provided to the commissioning agent Heating water piping and pump prefunctional checklists completed Boiler controls energized and safety controls tested Startup report includes optimal and actual percent CO2,CO, O2, stack temperature; combustion efficiency and NOX Specified Get Price

  • Commissioning - M&E Prefunctional Checklists

    Safety controls installed and safe operating ranges for this equipment provided to the commissioning agent Heating water piping and pump prefunctional checklists completed Boiler controls energized and safety controls tested Startup report includes optimal and actual percent CO2,CO, O2, stack temperature; combustion efficiency and NOX Specified Get Price

  • Rankine cycle - Wikipedia

    The actual vapor power cycle differs from the ideal Rankine cycle because of irreversibilities in the inherent components caused by fluid friction and heat loss to the surroundings; fluid friction causes pressure drops in the boiler, the condenser, and the piping between the components, and as a result the steam leaves the boiler at a lower Get Price

  • Commissioning - M&E Prefunctional Checklists

    Safety controls installed and safe operating ranges for this equipment provided to the commissioning agent Heating water piping and pump prefunctional checklists completed Boiler controls energized and safety controls tested Startup report includes optimal and actual percent CO2,CO, O2, stack temperature; combustion efficiency and NOX Specified Get Price

  • NFPA 33 Spray Booth Regulations and Guidelines - Spray Systems

    Sep 11, 2018 · 8.5.5.1 Containers that meet the following requirements need not meet the requirements of the ASME Boiler and Pressure VesselCode, Section VIII, for construction, tests, and maintenance: (1) Pressure containers less than 150 mm (6 in.) in diameter (2) Pressure containers that operate at less than a gauge pressure of 1.03 kPa (15 psi)Get Price